Monthly Archives: September 2014

Coming tomorrow: Tula Tuesday

I couldn’t get photos of my newest Tula blocks yesterday because THIS happened:

IMG_1797.JPG

IMG_1795.JPG

IMG_1801.JPG

IMG_1796.JPG
Had to open a NEW homeowners insurance claim to see if our roof is even worse now. Honestly our best case scenario is that yesterday’s storm destroyed our roof and insurance will cover a new one. But it may take up to 5 days to get officially inspected as this storm caused “catastrophic” damage to our area…

It never ends here.

16 Comments

Filed under Uncategorized

Tula Tuesday: Blocks 71-75

This weekend I played catch-up!

IMG_1644

5 more blocks down, and I’m 3/4 of the way done with the entire book! Hopefully by this weekend I can finish through 80, and get myself back on my 10/month schedule.

Meanwhile, here’s a brief view of my progress.

Block 71: raccoons!

IMG_1672 IMG_1665

Block 72: polk dots and neons…

IMG_1673 IMG_1663

Block 73: turquoise and squirrel!

IMG_1676 IMG_1657

Block 74: grey and the floral green that photographs way more yellow than it really is.

IMG_1677 IMG_1655

Block 75: pinks and my fave focus fabric yet again.

IMG_1680 IMG_1649

I am supremely pleased to be able to report that I am feeling better. For real! I had the energy to do fun things with my family- like the Botanic Gardens Corn Maze and a pre season NHL game. In fact, on Sunday afternoon I started feeling achy, and realized I had gone the entire day with NO ibuprofen until 3pm! And I hadn’t missed it. This is very very exciting. I feel like I am slowly reclaiming my life. If only I felt that way about my house.

As always, here’s my progress to date. Next week I’ll have to start a new collage!

tula blocks 1 thru 25 city sampler blocks 26-50 blocks 51-75

Meanwhile, I’d love to see any Tula progress you’ve made. Link up below.

And I’ll be linking up at Sew Cute Tuesday, WIP Wednesday, and Let’s Bee Social. Hope to see you there!

36 Comments

Filed under Quilts, Tula Pink QAL, WIP Wednesday

These are the kind of stitches I like…

The only upside to my recent downtime has been…lots of knitting! I finished a pair of socks, knit an entire shawl in under a week, and knit the next shawl in 2 weeks… And I’m halfway through a pair of fingerless mitts for my husband, too.

Today I’m just sharing the second shawl- still no good pix of the first.

I bought the yarn years and years and years ago. (Also known as Jan, 2009.) I had it in my Rav destash section, but then, I saw this blog post from Fancy Tiger, and I had to cast on one of my own ASAP. The original yarn I tried fought with me- first by tangling horribly while I was trying to wind it (took 2 days to untangle) and then by not at all looking like it did in my imagination 😦 So I had to go back to the drawing board/stash- and this 5 year old skein was just the ticket.

petal

Not too overpowering, but still fun. Rabbit Ridge Designs sock yarn in Petal, in case you were wondering.

The pattern, Antarkis, was a bit of a splurge, but after I saw it I just couldn’t stop thinking about it. So I bought it, and got started. Had I not dropped a stitch, and not noticed, at the very end, I would have been done a week ago. But I ended up ripping back and redoing the end of the shawl- and it was worth it. The error would have made me furious had I left it in, and I never would have worn the thing…

So without further ado, ta-da! The new shawl- and ME! Because I felt well enough to be in a photo and let you see me…

IMG_1565 IMG_1571 IMG_1574

If I ever make it again, I’ll go up a needle size (from 5 to 6.)  I’ve been known to knit very tightly… especially when stressed! I had enough yarn left at the end that I repeated the final section one extra time.

I wore it to work today, and got loads of compliments- a nice ego boost AND bonus distraction from the house/healing stress! Now to finish the second mitt for my husband, and then decide what to cast on next.

20 Comments

Filed under Knitting, Shawls

Tula Tuesday: Blocks 67-70 (finally!)

I sewed.

For real!

IMG_1544

I finished my August Tula blocks, halfway through September. SO glad I finished the triangle section before I got sick! Would have sucked to come back to those!

Brief sam-post-gallbladder-update for those who are interested. If you just want the quilt blocks, skip down 2 paragraphs, no hard feelings. I am finally, a month post-surgery, starting to feel like myself again. My pain level around one incision stayed pretty high for longer than expected, and the verdict was eventually that the sutures were pressing directly on a nerve. No wonder I hurt so much! One of the sutures was forcing its way out of my body- a shockingly common and, to me, truly disgusting, post surgery occurrence- and after the surgical nurse fixed it, my pain level dropped instantly. Meanwhile, I had yet another blood pressure scare, which was, after more tests, determined to be stress based.

Stress, you say? About that. Aside from the lingering pain, there’s the slight matter of the house. There was some major miscommunication with the contractors. They were all set to start repairing the insides of our home that have sustained water damage from the leaking roof. So all set that they sent movers to take apart our home. After promising that the kitchen wouldn’t be touched, they accidentally packed up the entire thing, and moved the fridge, microwave, toaster oven, table, and chairs to the living room. Awesome. The next day they informed us that they weren’t able to test our roof for leaks due to liability reasons, and if they proceeded with the repairs without the test, the repairs wouldn’t be under warranty.  WTF? We had asked them to do that test 8 times, but they didn’t say nope, never, until after they ripped apart our house. Awesomer. There was so much hail in Colorado this summer that roofers are backed up for weeks, and it took hours of calls to find one who could do the test sooner than 2 weeks out. And then? We failed the test. So our house is ripped up, our roof could still leak in heavy rain, and insurance doesn’t cover the roof repair. I can’t imagine why my blood pressure is through the roof, can you??

I did finally squeeze in some sewing during all of this. First, I had to cut hundreds of white 4.5″ squares. Because at Annie’s school, 2 teachers, and one teacher’s wife, are pregnant. Because I need a deadline like I need a hole in my head my roof, I contacted the art teacher and offered to work with her to help the kids make a quilt for each of the 3 babies. 2 are due the first week of November, one in mid-December. The kids are going to dye the squares, and I’ll piece them together. The school is tiny- 60ish kids from 6th-12th grade- and I’m looking forward to helping them with this project.

After the cutting, came the sewing. 2 episodes of OITNB later, I had four blocks, and had finally finished my August goal.

Block 67: I busted out one of my fave ever Heather Ross prints. I found an extra yard of it stashed in the guest room (when we had to move Henry in during the dry-out of his room), so that’s a positive.

IMG_1557 IMG_1536

Purple, grey, and pretty.

Block 68: my fave feature print and some happy green solids.

IMG_1555 IMG_1537

 

Block 69: teeny tiny pieces, and squirrels. I love the squirrels. (Top photo’s color is a better representation.)

IMG_1553 IMG_1540

 

And finally, Block 70: purple! My fave Tula Acacia print. Happiness! (Bottom photo is a better color representation.)

IMG_1551 IMG_1541

 

Next up, the squares section of the book. Squares I can handle 🙂

As always, here’s my work to date:

tula blocks 1 thru 25 city sampler blocks 26-50 blocks 51 thru 70

 

Just in case anyone is still out there, and also made it all the way to the end, and also wants to share their own Tula progress, here’s the linkup:

 

Meanwhile, here’s hoping I’m back to blogging and commenting and reading more regularly. Hope you are all doing better than me and my house!

PS Now that I have some actual work to share, I’m linking up with Sew Cute Tuesday and WIP Wednesday

10 Comments

Filed under Quilts, Tula Pink QAL

She’s aliiiiive- no, really (aka blergh part 3)

Last time I dropped by here to chat, it was just a few days after my fun and exciting emergency gallbladder removal.

August was a hell of a month.

The leaking roof, the gallbladder- those you know about. But we had a few family issues that I’m not going to share here- you’ll have to trust me when I say that they were/are super sucky. While I was still working on physically recovering, our microwave decided to die (or rather, to only work on the popcorn setting, and also, to come on all by itself. Freaky!) And then, after I went back to work, my car battery died. Thank goodness the awesome facilities staff were able to give me a jumpstart so I could get to the shop and get a new one installed… That day, when I finally made it back home and to my bed, our satellite TV was out.

Speaking of going back to work, I didn’t pull that off very well. At one week post-op, I went in for 4 hours. And woke up in agony the next day. I stupidly went back anyway, and made myself worse.  Cue a 3 day stint in bed, the only pro being that I watched the final 2 seasons of True Blood in an epic binge. At least by this point I was able to knit again.

Speaking of knitting… this illness and knitting didn’t mix at first. Post 1st ER, pre 2nd ER/surgery, I tried to work on my Drogon socks. (Pattern from April Cookie A Sock Club, using my own yarn purchased many years ago.)

str korpii

I had one sock done, and was ready for the heel flap on the second. I diligently plowed thru the heel flap, perhaps while on Percocet. And the next day I realized I had counted my stitches incorrectly and had to rip the whole thing back. I was so frustrated, and worried about screwing up again, that I put it down. Apparently knitting on narcotics is way worse than knitting drunk, at least for me.

Then came the surgery, and the pain. Aside from the fact that for the first week, I was on some potent pain pills and was afraid to risk another heel debacle, it also hurt to hold my arms where I normally would when knitting. D’oh. I plowed through my entire Kindle backlog, averaging a book a day. Finally I felt like I could handle knitting again, but I was afraid to go back to the sock until I was significantly better. So I dug through my Ravelry cue and stash pages until I found a super simple project that I could make with yarn that I had on hand- and even better, yarn that didn’t need to be wound. I cast on the Boneyard Shawl by Stephen West on 8/18, and finished it on 8/24. (The pattern repeat is literally 2 rows until you get to the final border…) You don’t get any pics yet as I’m not feeling up to being in them, or letting you see me…

After I finished the shawl, I felt brave enough to go back to my socks. And now they’re done. 2nd time was a charm on that heel…

DSC_7557 DSC_7551 DSC_7547 DSC_7543

The left and right socks are mirrored. The pattern is meant to evoke the scales of Drogon, the most fearsome of the dragons from Game of Thrones. I’d had this Socks That Rock Lightweight in the Korpii color way sitting around for literally years- and it worked perfectly in this pattern. Because the yarn is a bit thicker, and the yardage a bit shorter, I went down a size from normal for me. I also eliminated one pattern repeat… They fit perfectly and I finished with just a bit of yarn to spare.

So it’s a new month. I’m really hopeful that September will be kinder to me and my family. My recovery is back on track. I’m not sure if for some reason I’m having a rougher time than is normal, or if I underestimated the impacts of surgery, even if it was laparoscopic. Regardless, I am now taking it verrrrry easy. I am back at work. On try #2, I went back 3 hours on monday, 4 on tuesday, etc. Today I basically made it an entire work day! My pain is overall way more manageable, and in a week I’m allowed back in hot tubs. If only we owned a hot tub… My car is fine now that it has a shiny new battery, and we got a new microwave on sale over the weekend (bless the internet- we shopped and bought it online, with store pickup, done by my husband, and I didn’t even have to get out of bed.) The contractors should be starting the repair work next week- they would have started this week but I couldn’t handle it while still feeling lousy. They say it’s a one week job, so I’m thinking 2?

I’ve missed you all terribly. While I was feeling lousy, I didn’t even look at my bloglines feed. I’m hoping to start making the rounds and visiting you all again very soon.

Thank you again for all the kind comments and well wishes. They were a comfort when it felt like everything that could go wrong, was…

17 Comments

Filed under Knitting, Shawls, westknits